Monday, August 25, 2008

connecting Cisco 7911G into the wiring closet for initial configuration

Today's work in a shot:

Here the 7911(s) are connected into the wiring closet to provide initial configuration, after this step, we distributed the phones into their respective offices/desks.

Installed and configured:
2 x 3560G PoE 24 ports switches
1 x 3560G 48 ports switch
unpacked and configured about 30 x 7911G ip phones.

just
a
funny
work
;-)

No comments: